< Terug naar vorige pagina

Publicatie

Analysis of the effects of process parameters on start-up operation in continuous wet granulation

Tijdschriftbijdrage - Tijdschriftartikel

Toward further implementation of continuous tablet manufacturing, one key issue is the time needed for start-up operation because it could lead to lower product yield and reduced economic performance. The behavior of the start-up operation is not well understood; moreover, the definition of the start-up time is still unclear. This work investigates the effects of process parameters on the start-up operation in continuous wet granulation, which is a critical unit operation in solid drug manufacturing. The profiles of torque and granule size distribution were monitored and measured for the first hour of operation, including the start-up phase. We analyzed the impact of process parameters based on design of experiments and performed an economic assessment to see the effects of the start-up operation. The torque profiles indicated that liquid-to-solid ratio and screw speed would affect the start-up operation, whereas different start-up behavior resulted in different granule size. Depending on the indicator used to define the start-up operation, the economic optimal point was significantly different. The results of this study stress that the start-up time differs according to the process parameters and used definition, e.g., indicators and criteria. This aspect should be considered for the further study and regulation of continuous manufacturing.
Tijdschrift: PROCESSES
ISSN: 2227-9717
Issue: 9
Volume: 9
Jaar van publicatie:2021
Toegankelijkheid:Open